| Project Name | CLIENT |
| Upgrade of 21 Khuff Gas Wells in Shedgum and Uthmaniyah | Saudi Aramco |
| Flow-lines and Water Injection Lines for Khursaniyah & Qatif including Trunk-Line & Test Line | Saudi Aramco |
| Sales Gas Supply to E/W Pump Stations 1, 2 & 3 (Detailed Design) | Saudi Aramco |
| Sweet Gas Purging Connection at Berri Gas Plant | Saudi Aramco |
| Additional Fuel Gas Line, Abqaiq Plants | Saudi Aramco |
| Emergency Isolation Valves at Jeddah Refinery | Saudi Aramco |
| Instrument Scraper Traps at 3 Major Pipelines at Jeddah Area | Saudi Aramco |
| Design of Modifications of Back Pressure Control by means of PCV’s in by-pass arrangements - Control Variance in Flow Rates. | Saudi Aramco |
| Waste Water Environmental Protection, Abqaiq Plants | Saudi Aramco |
| Jet Fuel Supply Pipeline to KFIA | Saudi Aramco |
| North Nose Manifold Expansion at Abqaiq GOSP-3 | Saudi Aramco |
| Provide a detailed design package for the demolition and removal of Existing Oil Seal Systems for the retrofitting re-generation of Gas Compressors and replacement with Dry Gas Seal Systems. | Saudi Aramco |
|