Project Name | CLIENT |
Preliminary Design for Oily Water Sewer System Upgrade | Saudi Aramco |
Expansion of GSM4 Mobile System Civil, Mechanical, Electrical Design, and Tower Analysis. | L. M. Ericsson |
Detailed Design of Lucent /TEP 6 GSM Expansion | Lucent Technologies |
New Oily Sewer Disposal System at Al-Hasa Bulk Plant | Saudi Aramco |
Oily Waste Water Sewer System at Al-Jouf Bulk Plant | Saudi Aramco |
Install a Fire Protection System at Old Abqaiq Plant Building | Saudi Aramco |
Upgrade the Fire Water System, Raw Water System, and Sweet Water System at Utmaniyah Store Yard. | Saudi Aramco |
Sunshade for Fire Truck Pump Testing Facilities, Transportation Facilities, Dhahran. | Saudi Aramco |
Fire Station for Airport Rescue Vehicles at East/West Pump Station No. 6. | Saudi Aramco |
Installation of Fire Alarm and Detection System for 8 Buildings at QSTP | Saudi Aramco |
Upgrade Fire Water, Drinking Water and Raw Water Systems at Juaymah Stores Yard | Saudi Aramco |
Provision of Valves on Existing Medical Gas Lines for Oncology Treatment Center at Dhahran Health Center | Saudi Aramco |
|